Chemnitz

100 years anniversary of the Opera House

Opera tent for a classical music event

For the 100th anniversary of the Opera House and the König-Albert-Museum, the Opera House commissioned our staging and light design.

Raj Ullrich, Chief Technology Director of the Opera House, particularly emphasized the elegant appearance of the roof. At the same time the stage should provide an excellent acoustic projection and a capacity for 106 musicians. All of these features he could find only using our roof system.

We also took over the lighting of the stage and surrounding buildings. For this purpose we utilized 36 high-performance LED-lights, 8 moving-head projectors and 18 diverse spotlights.