Congress München

ESC

Opera at the Atrium of Munich Fairtrade Company

A 15x17 with system floor and attached ballast was used at the ESC Congress:
A three-dimensional gradient of almost half a meter had to be compensated, in addition, the underground did not allow eart anchoring.

So our system ballast was used. With the help of a truck crane, it was transported to the atrium of the Munich Trade Fair Center , where it was connected to the system floor with a positive fit. Thus, the actually required ballast could be significantly reduced.

Our customer could not hide the enthusiasm about this system:
"This is 100% professional! A great Work and a nice tent with a perfect finish!“