Chillventa 2024
Nürnberg, Germany
To celebrate the 90th anniversary of Bitzer GmbH, we were able to realize our unique multi-variant.
For the construction of this special tent solution, we combined four main roofs of our Opera-Tent 18 × 21. These were connected with a Triple-Joiner as well as a Duo-Joiner, creating a spacious, continuous roof structure.
As an entrance area, we additionally used an Opera-Tent 10 × 12 in the open single variant, which stylishly guided visitors into the tent complex.
The construction of our Opera-Tent in the multi-variant presented us with a special challenge: The tent had to be completed two days earlier than originally planned. Thanks to our years of experience and our well-coordinated team, we were able to successfully complete the construction site two days ahead of schedule.